GUIDE
How to register with Lootah BCGas as a new tenant
The main things to know before you start
-
Lootah BCGas has a new gas connection application on its website and also accepts connection requests through its app.
-
Its application asks for the tenant’s details, the property address, billing address, landlord’s details and supporting documents.
-
Lootah’s form lists proof of payment for the security deposit and connection fee, so call first to confirm the correct amount.
-
Lootah says gas is usually available within one or two business days following a request in an existing building. The actual appointment depends on the completed application, property and service availability. apps.lootahbcgas.com
Lootah BCGas contact details
| What you need | Contact or link |
|---|---|
| Customer service and gas emergencies | 800 5224, 24 hours a day, 7 days a week |
| Calling from outside the UAE | +971 4 607 8666 |
| General customer service email | call_center@lootahbcgas.com |
| Activation documents and payment receipt | activation@lootahbcgas.com |
| Customer portal | apps.lootahbcgas.com |
| New gas connection form | Gas Connection Request |
| New connection payment | New Gas Connection Payment |
| Android app | Lootah BCGas on Google Play |
| iPhone/iPad app | Lootah BCGas on the App Store |
| Dubai customer service centre | SS Lootah Building, Salahuddin Road, Deira, Dubai |
Lootah lists its office hours as Monday to Friday, 8:30 a.m. to 5:30 p.m. The call centre operates 24/7. Call before visiting the office to confirm what can be completed there. apps.lootahbcgas.com
PART 1: Before You Register
Check whether your home uses gas
Before opening an account, find out what type of cooker and supply the property has.
If the apartment has a central gas system
Gas is supplied through a building or community system. If Lootah BCGas is the appointed supplier and the tenant is responsible for the account, you will normally need to request a new connection or account in your name.
If the apartment has an electric or induction hob
An electric or induction appliance does not use a gas connection. Check whether the property has any other gas-powered appliance before deciding you do not need an account.
If the property uses a gas cylinder
Ask building management whether cylinders are permitted and who the approved supplier is. Do not assume that a central gas account is the correct process.
If the property has a built-in gas hob
Ask the landlord or building management:
-
Is the hob already connected?
-
Who supplied and installed it?
-
Is it compatible with the type of gas supplied to the property?
-
Does it need inspection or reconnection before use?
-
Who pays if it needs repair or conversion?
Lootah says the gas supplied can be natural gas, synthetic natural gas or LPG, depending on the area. Ask Lootah which type is used in your property. apps.lootahbcgas.com
Confirm Lootah BCGas is the supplier
Ask the landlord, property agent, building reception or facilities management:
“Does Lootah BCGas supply the gas for this apartment, and do I need to open the account in my own name?”
Also ask:
-
Is the gas already connected to the apartment?
-
Is the tenant responsible for the account and bills?
-
Is gas included in the rent?
-
Is the cooker included in the apartment?
-
Is a move-in permit needed before Lootah’s technician can visit?
-
Is there a building contact who can help with access?
-
Has the previous occupant closed their gas account?
If the property is brand new, ask whether the building’s gas system has passed the required inspections and has been handed over. Lootah says it cannot activate gas in a new building until the required inspections and handover are complete. apps.lootahbcgas.com
Call Lootah before starting the application
Call 800 5224 and provide:
-
Your name.
-
Mobile number.
-
Community and building name.
-
Apartment or villa number.
-
Tenancy start date.
-
Planned move-in date.
Lootah says the operator can check availability, advise the fees and explain when the connection can be arranged. apps.lootahbcgas.com
What to ask during the call
Write down the answers to these questions:
-
Do you supply my exact building and unit?
-
What is the security deposit for my unit?
-
What is the connection or activation fee?
-
Is VAT included in those amounts?
-
Is cooker connection included in the fee?
-
Are there any additional charges for a hose, parts, appliance conversion or installation?
-
Which documents do you need from me?
-
Where can I obtain the Gas Service Agreement?
-
Should I pay before submitting the online form?
-
When is the earliest technician appointment?
-
Must I be present, or can another adult provide access?
-
Does DEWA electricity need to be active for the visit?
Ask for the fee breakdown and any special instructions by email if possible.
PART 2: Documents and Costs
Prepare the documents
Lootah’s online connection form lists the following documents for residential or commercial applicants. Confirm which apply to your specific unit before submitting. apps.lootahbcgas.com
For an individual tenant
| Document | What to prepare |
|---|---|
| Passport | A clear copy of the applicant’s passport. |
| Emirates ID | A clear copy of the front and back. |
| Tenancy contract | The form refers to the main page of the tenancy contract or purchase agreement. |
| Security deposit and connection fee receipt | Proof of the confirmed payment. |
| Gas Service Agreement | The form lists this as a document. Ask Lootah to provide it and tell you whether it must be signed before submission. |
For a new villa or townhouse
The form lists a Civil Defence final certificate or authority approval for a new villa or townhouse. Ask Lootah whether it applies to your property and whether the landlord, developer or building management should provide it.
If the tenancy is under a company
The form also lists:
-
Trade licence.
-
VAT certificate, if applicable for company accommodation.
Ask Lootah if it needs an authorisation letter or identification for the company representative.
Is Ejari required?
The visible document list on Lootah’s connection form refers to the tenancy contract or purchase agreement main page. It does not specifically list Ejari there. Ask Lootah whether it requires Ejari for your building or application.
What if my Emirates ID has not been issued yet?
The form marks the Emirates ID number, expiry date and copy as required. Call Lootah and ask whether it can accept an alternative document or start the application manually. Do not enter an incorrect number to complete the form.
Confirm the deposit and fees
Lootah’s FAQ says a new customer pays:
-
A service activation fee.
-
A deposit on the gas billing account.
The deposit is refundable when the customer requests disconnection, subject to any outstanding charges and the applicable account terms. apps.lootahbcgas.com
Charges to ask about
| Charge | Question to ask |
|---|---|
| Security deposit | How much is the deposit for my unit? |
| Connection or activation fee | How much is the one-time charge? |
| VAT | Are the quoted amounts inclusive of VAT? |
| Cooker connection | Is connecting the cooker included? |
| Installation parts | Are a hose or other parts included, if needed? |
| Cooker conversion | Is conversion required, and who can perform it? |
| Recurring fixed charge | Is there a standing charge even if I use little or no gas? |
| Consumption charge | How will gas use be measured and billed? |
| Reconnection charge | Does it apply if the unit’s service was previously disconnected? |
Lootah says tariffs are based on its agreements with developers, so charges may differ by property or community. test-apps.lootahbcgas.com
Rough budget
As a general planning reference, one Dubai real estate tenant guide says cooking-gas deposits and connection charges can range from AED 500 to AED 1,000 or more, depending on the supplier and property. This is not a Lootah quote. Additional appliance work may increase the amount. bridgesandalliesre.com
| Item | Planning figure |
|---|---|
| Deposit and connection charges | AED 500–1,000 or more — general estimate only |
| Additional cooker installation or conversion | Ask Lootah for a quotation |
| VAT | Confirm whether included |
| Monthly or periodic gas bill | Depends on the tariff, fixed charge and usage |
Before paying, get the exact total from Lootah for your apartment.
PART 3: Paying for the New Connection
Pay the confirmed deposit and connection fee
Lootah’s online application lists proof of payment among the documents. Once Lootah confirms the correct amount, you can ask which of the following methods applies to your property.
Option A: Pay online
Open:
The payment page asks you to enter:
-
Customer name.
-
Email address.
-
Mobile number.
-
Location.
-
Building details.
-
Payment description.
-
Amount.
Then select Pay Now and complete the card payment.
Important: The payment page asks you to type the amount. Use the amount Lootah confirmed; do not guess.
After paying:
-
Save the receipt.
-
Check that the name and property details are correct.
-
Send the receipt to activation@lootahbcgas.com, as instructed on the payment page.
-
Keep a copy to upload with your application. apps.lootahbcgas.com
Option B: Pay at Al Ansari Exchange
Lootah says new gas connection payments can be made through Al Ansari Exchange.
-
Confirm the amount with Lootah.
-
Visit an Al Ansari branch.
-
Explain that the payment is for a new Lootah BCGas connection.
-
Check the receipt before leaving.
-
Send the receipt with the application documents to activation@lootahbcgas.com.
-
Keep your own copy. apps.lootahbcgas.com
Option C: Pay at the customer service centre
Lootah lists payment at its Deira customer service centre. Call first to confirm:
-
The amount.
-
Accepted payment methods.
-
Opening hours.
-
Whether you can submit the application at the same visit.
Option D: Bank transfer
Lootah lists different bank accounts for certain communities on its payment page. Some of those details are presented for existing customer bill payments.
Before using bank transfer for a new connection, ask Lootah to confirm the correct beneficiary and account for your unit. apps.lootahbcgas.com
PART 4: Website Registration — Every Section Explained
Open the correct application
Go to:
Lootah BCGas Gas Connection Request
Alternatively:
-
Open the Lootah BCGas Customer Portal.
-
Find Gas Application.
-
Select Request.
Do not confuse these two options
| Portal option | Use |
|---|---|
| Gas Application | Request a new gas connection. |
| Register Here | Register an existing customer for online account access and bill payment. |
Lootah’s app guide says online account registration requires a customer number. If you are new and do not have one, start with Gas Application or contact the call centre. apps.lootahbcgas.com
Section A: Customer or Customer Representative Details
The following fields appear on the form. An asterisk indicates that the form marks the field as required. apps.lootahbcgas.com
Company name
-
Complete this if the application is under a company.
-
If you are an individual tenant, ask Lootah if the field should be left blank.
First name and last name
-
Enter your name as shown on your passport or Emirates ID.
-
Check the spelling before continuing.
Mobile number
-
Enter the number Lootah can use to contact you about the application and appointment.
-
If you will be abroad, ask Lootah whether it can contact your representative.
Nationality
- Select your nationality from the available list.
Email address
-
Use an email you check regularly.
-
Lootah may use this for the application, payment and account communications.
Passport number and expiry date
-
Enter the passport number accurately.
-
Enter the expiry date in the format requested by the form.
-
Upload the passport copy in the indicated field.
Emirates ID number and expiry date
-
Enter the ID number and expiry date.
-
Upload the Emirates ID copy as requested; prepare both sides.
Visa details
-
The form also has visa number and expiry date fields.
-
Complete them if applicable or if Lootah asks you to.
Company details
For a company application, complete any applicable:
-
Trade licence number.
-
Trade licence expiry date.
-
Tax registration number.
Section B: Residence or Business Address
Enter the address where gas will be activated.
Building number
Enter the building number if you have one. If you do not know it, ask building management or Lootah.
Apartment or villa number
Enter the full unit number exactly as it appears in the tenancy contract.
Building name
Enter the tower or building name.
Location
Enter the community or area, such as the name given by building management.
Emirate and country
Complete the emirate and country fields.
P.O. Box
Complete this if applicable.
Before moving on
Check that the building name and unit number match:
-
Your tenancy contract.
-
Your payment receipt.
-
The details you gave to the call centre.
An incorrect unit number can delay the application or technician visit.
Section C: Billing Details
This section asks for the address and contact details used for billing.
Address lines
Enter the requested billing address. Complete additional lines if needed.
If you are unsure whether you should enter the apartment address or another address, ask Lootah.
Mobile number
Enter the number to be used for billing contact.
Type of establishment
For an apartment or villa tenant, select:
Residential
The form also has options for retail/restaurant and hotel applications.
Number of bedrooms
Select the number of bedrooms in the property.
Do not count the living room as a bedroom. If the available options do not match your unit type, check with Lootah.
Section D: Landlord Details
The form marks these landlord details as required:
-
First name.
-
Last name.
-
Mobile number.
-
Email address.
There are also fields for landline and fax, if applicable.
Where to get the details
Check:
-
Your tenancy contract.
-
The property agent.
-
The landlord or property manager.
If the owner is a company or the landlord does not have separate first and last names in the form expected, ask Lootah how to complete the section.
Do not use your own name or number as the landlord’s details simply to proceed.
Section E: Preferred Billing Address
The form offers these options:
-
Residence or business address.
-
Billing address.
-
P.O. Box.
Choose the address you want Lootah to use for billing correspondence.
Also ask customer service:
-
Will bills be emailed?
-
Will I receive SMS notifications?
-
Can I view invoices in the app?
-
How often is my unit billed?
Section F: Upload Documents
Tick the boxes for the documents you are uploading and attach the files.
For an individual residential tenant, prepare:
-
Passport copy.
-
Emirates ID, front and back.
-
Tenancy contract main page.
-
Proof of payment for the confirmed deposit and connection fee.
-
Gas Service Agreement, if Lootah says it is required.
Additional documents where applicable
-
Civil Defence final certificate or authority approval for a new villa or townhouse.
-
Trade licence and VAT certificate for company accommodation.
-
Any additional documents Lootah requests for your property.
The form lists image, PDF and Word formats among those accepted. Check that every file is legible before uploading. apps.lootahbcgas.com
If you have not received the Gas Service Agreement
Call 800 5224 or email activation@lootahbcgas.com:
“The connection form lists a Gas Service Agreement. Please send it to me and confirm whether it must be signed and uploaded before I submit.”
Section G: Review and submit
Before pressing Submit, review:
-
Your name, ID numbers and expiry dates.
-
Email and mobile number.
-
Building and apartment number.
-
Residential category and bedroom count.
-
Landlord’s name, mobile number and email.
-
Payment amount and receipt.
-
All requested documents.
Then:
-
Select Submit.
-
Save any confirmation displayed.
-
Record the application reference if provided.
-
Check your email for a response.
-
If no confirmation appears, call Lootah and ask whether the request was received before submitting a duplicate.
PART 5: Registration Through the App
Download the official app
The app listings say you can submit a new connection request, upload documents and pay online. play.google.com
Submit a new gas request through the app
Lootah’s app guide describes the following route:
-
Open the app.
-
Find Our Services.
-
Select Gas Application Form.
-
Enter the customer or representative details.
-
Complete the property, billing and landlord details.
-
Upload the required documents.
-
Submit the request.
-
Save any confirmation or reference.
For payment, the guide also lists:
Quick Pay → New Connection Payment
Confirm the amount with Lootah before entering it. App screens may change when the app is updated. apps.lootahbcgas.com
PART 6: Phone, Email and In-Person Routes
Applying with help from the call centre
Call 800 5224.
-
Explain that you are a new tenant requesting gas activation.
-
Provide the building, unit and intended move-in date.
-
Ask the operator to confirm the supplier, fees and documents.
-
Ask whether the request can be started by phone or whether you must complete the website/app form.
-
Ask where to obtain the Gas Service Agreement.
-
After submitting and paying, call back with your reference and request an appointment.
The call centre is available 24/7, but technician appointment availability should be confirmed separately.
Applying or following up by email
Lootah’s payment instructions ask customers to send the new connection payment receipt to:
activation@lootahbcgas.com
Ask Lootah whether it accepts the complete application by email for your unit or whether you must also use the online form.
Include:
-
Full name.
-
Mobile number.
-
Building and unit.
-
Move-in date.
-
Application reference, if available.
-
Payment receipt.
-
Any documents Lootah specifically requested.
Example subject
New gas connection – [Building name] – [Apartment number]
Visiting the customer service centre
Lootah lists its Dubai customer service centre in Deira and says payments can be made there. Call before visiting to ask whether it can process the full new connection application at the counter.
Take:
-
Passport and Emirates ID copies.
-
Tenancy contract main page.
-
Landlord’s contact details.
-
Gas Service Agreement, if already provided.
-
Payment receipt, if paid.
-
Property address and move-in date.
Before leaving, ask for:
-
Application reference.
-
Payment receipt.
-
Any missing-document list.
-
How and when the technician appointment will be arranged.
PART 7: After Submission
Confirm Lootah received the application
After applying, check that Lootah has:
-
Received the form.
-
Received all required documents.
-
Received the payment receipt.
-
Allocated the payment to your application.
-
Confirmed whether the application is complete.
-
Given you an application reference or another way to follow up.
If you have not received a response
Call 800 5224 and say:
“I submitted a new gas connection request for [building and unit] on [date]. Can you check whether the application and payment have been received and tell me what is still required?”
Have your payment receipt and application reference ready.
If a document is rejected
Ask the team:
-
Which document was rejected?
-
Why was it rejected?
-
Does it need to be clearer, re-signed or replaced?
-
Should I upload it again or email it?
-
Will the activation date change?
Book the activation appointment
Once the application and payment are accepted:
-
Request the earliest available technician visit.
-
Confirm the appointment date and time window.
-
Confirm the technician’s access arrangements.
-
Ask whether you or a representative must be present.
-
Ask whether the cooker must already be delivered and positioned.
-
Confirm whether DEWA electricity needs to be active.
-
Ask whether cooker connection, conversion or parts are included.
-
Ask whether a fee applies if the appointment must be rescheduled.
Lootah says a technician visits after the required fees are paid to activate the gas and check that it is working safely. apps.lootahbcgas.com
PART 8: Cooker Preparation and Activation Day
Make sure the cooker is ready
Before the appointment, check with Lootah:
-
Is the cooker compatible with the gas type used in the building?
-
Does it have the required safety features?
-
Is it already installed?
-
Does it need approved conversion?
-
Is a separate installer needed?
-
Are connection parts included?
-
Must the cooker be in its final position?
Lootah’s FAQ discusses flame-failure safety features. Ask the technician to assess the appliance rather than assuming it is compatible. apps.lootahbcgas.com
Do not connect, disconnect, modify or test a gas line yourself. Arrange the work through Lootah or an appropriately authorised technician.
What to do on activation day
Before the technician arrives
-
Ensure the apartment is accessible.
-
Inform building security if required.
-
Have your payment receipt and application reference ready.
-
Make sure the cooker is accessible.
-
Have the landlord or property manager’s number available.
During the visit
Ask the technician to confirm:
-
The gas supply is active.
-
The cooker is compatible.
-
The connection has passed the required safety checks.
-
The appliance is working correctly.
-
Whether any repair, conversion or follow-up visit is needed.
-
Where the shut-off control is.
-
What to do if you smell gas.
-
Whether any additional charge is payable.
Lootah says the technician checks that the service is working properly and safely and advises customers on safe gas use. apps.lootahbcgas.com
Before the technician leaves
Ask:
“Is the cooker safe and ready for me to use now?”
Only use it after the technician confirms it is ready.
What if activation cannot be completed?
Ask for a clear explanation and the next step. Possible issues include:
-
The cooker is incompatible with the supplied gas.
-
A required safety feature is faulty or missing.
-
The appliance or connection is not ready.
-
Access to the apartment is unavailable.
-
Documents or payment are incomplete.
-
The building’s gas system is awaiting approval.
-
A separate authorised installer must complete work first.
Then confirm:
-
Who is responsible for fixing the issue?
-
Is the landlord’s approval required?
-
Is there an additional cost?
-
Who pays for the repair or conversion?
-
How do you book the next visit?
-
Will the appointment affect the billing start date?
PART 9: Timing
How long does the process take?
Existing building
Lootah says gas is usually available within one or two business days following the request in an existing building. This is general guidance, not a guaranteed appointment time. apps.lootahbcgas.com
New building
A new building must have completed the necessary inspections and handover. If approvals are still pending, the service may not be ready even if the tenant’s own application is complete.
Suggested timeline
| Timing | Action |
|---|---|
| 5–7 business days before move-in | Confirm the supplier, costs, documents and cooker requirements. |
| As soon as documents are ready | Pay the confirmed charges and submit the application. |
| After submission | Confirm Lootah received the documents and payment. |
| Before move-in | Book the technician and arrange building access. |
| Activation day | Complete the technician’s safety check and obtain confirmation before using the cooker. |
Start earlier if the property is newly handed over or the cooker may need conversion.
PART 10: After Activation
Get your account number and register for online access
Ask Lootah for your customer number or gas account number once the account is created.
Then:
-
Open the customer portal or app.
-
Select Register Here or Register for Online Account.
-
Enter your customer number.
-
Follow the email and password setup instructions.
-
Sign in and check that the correct unit is listed.
Lootah’s guide says to use the email address registered on the gas application. apps.lootahbcgas.com
Understand your gas bill
Lootah says:
-
A metered account may have a standing charge plus a charge based on gas used.
-
A non-metered account may be billed on a standing or flat-rate basis.
-
Some customers may use a prepaid smart-card meter. apps.lootahbcgas.com
Its FAQ says residential users are invoiced every three months, but you should confirm the billing cycle for your own unit and follow the due date shown on your bill.
Check your first bill for:
-
Customer name and unit number.
-
Gas account number.
-
Billing period.
-
Meter readings, if applicable.
-
Fixed charge.
-
Consumption charge.
-
Any previous balance.
-
VAT and due date.
Paying future bills
Lootah lists several payment channels, including:
-
Customer portal or app.
-
Al Ansari Exchange.
-
Customer service centre.
-
Bank transfer using the correct account for your community.
-
MBME kiosks.
-
DubaiNow for gas bill payments.
Lootah’s instructions for DubaiNow are:
-
Sign in to DubaiNow.
-
Open Bills & Utilities.
-
Search for Lootah BCGas.
-
Add the service using your gas account details.
-
Pay manually or use the available automatic payment option. apps.lootahbcgas.com
PART 11: Moving Out
Close the gas account and request your deposit
Before moving out, ask Lootah to arrange permanent disconnection and issue the final bill.
The app guide lists:
Services → Permanent Gas Disconnection
It also lists a section for providing refund bank details. apps.lootahbcgas.com
Ask Lootah:
-
How much notice is required?
-
Does a technician need access?
-
When will the final meter reading be taken?
-
When will the final bill be issued?
-
Will outstanding charges be deducted from the deposit?
-
What bank details are required?
-
How long will the refund take?
-
Will I receive a clearance confirmation?
Lootah’s app guide advises not disconnecting DEWA before the gas deactivation visit, because the team needs to verify the gas line is safely disconnected. Confirm this with Lootah when booking.
Keep your original deposit and payment receipts until the account is closed.
PART 12: Gas Emergency
What to do if you smell gas
-
Move away from the affected area and go to a safe location.
-
Do not turn electrical switches on or off.
-
Do not use a phone, matches, cigarettes or another ignition source in the affected area.
-
From a safe location, call Lootah BCGas on 800 5224.
-
If there is a fire or immediate danger, call Dubai Civil Defence on 997.
-
Follow the instructions of emergency responders and building management.
Lootah advises staying away from a suspected leak and avoiding switches and ignition sources. lootahgas.com
PART 13: Ready-to-Send Enquiry
To: activation@lootahbcgas.com
Subject: New gas connection – [Building name], [Apartment number]Hello Lootah BCGas Team,
I am a new tenant at [building name, community and apartment number], and my intended move-in date is [date].
Please confirm whether Lootah BCGas supplies this property and advise:
-
The documents required for my application.
-
Where I can obtain the Gas Service Agreement.
-
The security deposit and connection fee for my unit, including applicable VAT.
-
Whether cooker connection is included or charged separately.
-
Whether my cooker needs to be present before the technician visit.
-
How I should pay and submit my receipt.
-
Whether I need to apply through the website, app or email.
-
The earliest available activation appointment.
-
Whether I or a representative must be present.
-
Whether electricity needs to be active for the visit.
My contact number is [number] and my email address is [email].
Thank you.
Sources
More Gas guides
Related guides
Next step
Home internet in Dubai: getting connected in your new home