Build my checklist
← Back to the Gas guide

GUIDE

Provider logo

How to register with Royal Gas as a new tenant

By JJay Ellis ·Checked against official sources· Updated November 2026Follow @getsetl.ae

For a new Dubai tenant, Royal Gas publishes an email registration route and has a New Gas Connection option on its online services portal. Its app is also advertised as supporting new connection requests. The process generally involves submitting your documents, signing the agreement, paying the applicable charges and arranging a Royal Gas technician to connect the service. Royal Gas

Before starting: Royal Gas does not publish a single residential deposit amount, connection fee or activation timeframe for every Dubai property. Confirm the exact charges and appointment with Royal Gas for your building.

What you needContact or link
Dubai and Northern Emirates customer care / gas emergency800 7427
Abu Dhabi and Al Ain800 74427
Dubai office contact04 522 9111
Dubai new connection email listed in FAQsupport@royalgas.com
Dubai support email listed on contact pagesupport@royalgas.ae
Royal Gas websiteroyalgas.com
Online servicesRoyal Gas Online Services
New gas connection requestRoyal Gas Connection Application
Customer portalRoyal Connect Customer Portal
Android appRoyal Gas on Google Play
iPhone appRoyalGas on the App Store
Dubai office addressAl Mezan Tower, Muhaisnah 4, Dubai

Which email should you use?

Royal Gas’s new connection FAQ lists support@royalgas.com for Dubai. Its contact page and some billing/refund instructions list support@royalgas.ae.

For a new connection, start with support@royalgas.com, as listed in the FAQ. If you do not receive a response, call 800 7427 and ask which email currently handles registrations for your building. Royal Gas

Customer service hours

Royal Gas’s online services page lists normal operating hours as 8:00 a.m. to 5:00 p.m., Monday to Saturday, with emergency services available after those hours. Another company page lists different hours, so call before visiting an office. Royal Gas

Before You Register: Does Your Home Need a Gas Account?

Ask the landlord, leasing agent, reception or building facilities team:

“Does this apartment have central gas, and is Royal Gas the appointed supplier?”

Check the type of cooker

Property setupWhat it means
Central piped gas with a gas cooker or hobThe apartment may need an account with the building’s gas supplier.
Electric or induction cookerThe cooker does not use gas. Check whether there are any other gas-powered appliances.
Built-in gas hobConfirm whether it is included, installed and compatible with the building’s gas supply.
Gas cylinder arrangementAsk the building whether cylinders are allowed and who the approved supplier is. Do not assume the central gas registration process applies.

Ask building management

  1. Is Royal Gas the supplier for this exact unit?

  2. Does the tenant need a separate gas account?

  3. Is gas included in the rent or billed separately?

  4. Is the cooker included with the apartment?

  5. Is the cooker already connected?

  6. Where is the gas meter?

  7. Is the meter accessible to the tenant?

  8. Is a move-in permit needed before a technician can attend?

  9. Has the previous occupant closed their gas account?

  10. Is the building’s gas system ready for activation?

If Royal Gas does not serve the unit, use the supplier appointed for that property.

Contact Royal Gas Before Applying

Call 800 7427 for Dubai.

Give the operator:

  • Your full name.

  • Mobile number.

  • Community name.

  • Building or tower name.

  • Apartment or villa number.

  • Tenancy start date.

  • Intended move-in date.

Ask these questions

“I am a new tenant at [building and unit]. Does Royal Gas supply this apartment, and what do I need to do to open the account and activate the gas?”

Also ask:

  1. What is the security deposit?

  2. What is the connection or activation fee?

  3. Is there a separate registration fee?

  4. Is VAT included?

  5. Which documents do you need?

  6. Will you send me a gas service agreement?

  7. Can I apply through the website, app or email?

  8. How do I pay the initial charges?

  9. Is the cooker connection included?

  10. Does the cooker need any conversion?

  11. Is electricity required before the technician visit?

  12. Must I be present, or can an authorised representative attend?

  13. When is the earliest available appointment?

Ask for an itemised quotation or written confirmation before paying.

Documents Required for a New Connection

Royal Gas’s FAQ specifically asks new customers to send copies of:

  1. Emirates ID.

  2. Passport and visa.

  3. Tenancy contract. Royal Gas

Prepare the following

DocumentWhat to do
Emirates IDPrepare a clear copy. Ask whether Royal Gas needs the front and back.
PassportPrepare a clear copy of the identification page and the visa copy requested by Royal Gas.
Tenancy contractPrepare a signed copy.
Gas service agreementRoyal Gas’s terms say the connection is made after the agreement is signed. Ask the team to send you the relevant agreement.
Payment receiptKeep proof once you have paid the confirmed deposit and connection fee.

Documents or details Royal Gas may additionally request

These were not confirmed as universal requirements, but have them ready if available:

  • Ejari certificate.

  • Building and apartment details.

  • Gas meter number or photo.

  • Landlord’s name and contact details.

  • Cooker make or photo.

  • Authorisation letter if someone is applying for you.

  • Company trade licence if the tenancy is under a company name.

Ask Royal Gas which additional items apply to your building.

What if I do not have the tenancy contract?

Royal Gas’s FAQ says all listed documents are required for connection approval. If your contract is not yet available, ask the company whether it can start reviewing your request while you obtain it. Royal Gas

What if my Emirates ID is still being processed?

The FAQ lists Emirates ID as a required document.Call Royal Gas and ask whether it will accept an Emirates ID application receipt or another document temporarily.

Royal Gas Deposit and Fees

Royal Gas’s published terms say it makes the connection after:

  1. The agreement is signed.

  2. The refundable security deposit is paid.

  3. The connection fees are paid. Royal Gas

What you may need to pay

ChargeWhat to ask Royal Gas
Security depositHow much is it for my unit? Is it refundable?
Connection or activation feeWhat is the one-time fee?
Registration feeIs this separate from the connection fee?
Cooker connectionIs the cooker connection included?
Parts or conversionAre there extra charges if the cooker needs parts or conversion?
VATAre quoted amounts inclusive or exclusive of VAT?
Recurring service or maintenance feeWhat fixed charges apply to my account?
Gas consumptionHow is usage calculated and billed?
Disconnection or reconnectionWhat fees apply later?

Royal Gas’s terms mention additional maintenance and service fees depending on the property and use. Ask for the rate that applies to your unit rather than assuming every apartment is charged the same. Royal Gas

Rough budget

As a general planning reference, a Dubai real estate tenant guide says cooking-gas deposits and connection charges may range from AED 500 to AED 1,000 or more, depending on the supplier and property. This is not a Royal Gas quote, and your actual cost may differ. bridgesandalliesre.com

ItemPlanning figure
Deposit and connection chargesAED 500–1,000 or more — general estimate only
Cooker installation or conversionTo be quoted if needed
VATConfirm whether included
Future gas billsDepend on usage and applicable service charges

Ask Royal Gas:

“Please send me the total amount due before activation, broken down into deposit, connection, registration, VAT and any cooker-related charges.”

Method 1: Register by Email — Detailed Steps

Royal Gas’s FAQ gives this as the new connection procedure for Dubai.

Method 3: Register Through the Royal Gas App

Royal Gas has advertised that its app allows customers to request new gas connections, submit meter readings and access online services. <span dir="rtl"></span>‏Royal Development For Gas Works‏

Download:

Steps

  1. Download and open the app.

  2. Look for New Gas Connection or a service request option.

  3. Follow the on-screen instructions.

  4. Enter your building, unit and contact details.

  5. Upload the requested documents.

  6. Review the agreement and any charges.

  7. Submit the request.

  8. Save the confirmation or reference number.

If the app asks for an existing account number or does not show a new request option, use the website or email Royal Gas.

Method 4: Register in Person

Royal Gas lists a Dubai office in Muhaisnah 4. Its website does not clearly confirm that every new connection can be completed at the counter, so call 800 7427 or 04 522 9111 before visiting. Royal Gas

Before going, ask

  1. Can the Dubai office process a new tenant connection?

  2. Do I need an appointment?

  3. What are the current opening hours?

  4. Should I bring original documents, copies or both?

  5. Can I sign the agreement at the office?

  6. Can I pay the deposit and connection fee there?

  7. Can the technician appointment be booked during the visit?

What to take

  • Emirates ID.

  • Passport and visa copy.

  • Tenancy contract.

  • Building and unit details.

  • Landlord’s contact details, if requested.

  • Payment receipt, if already paid.

Before leaving, request an application reference and written breakdown of any charges paid or outstanding.

Complete the Agreement and Pay

Royal Gas’s terms say the gas connection is made after the agreement is signed and the security deposit and connection fees are paid. Royal Gas

Before signing

Check:

  • Your name and apartment number.

  • The deposit amount.

  • Connection and registration charges.

  • Recurring service or maintenance charges.

  • How gas consumption is calculated.

  • VAT.

  • Disconnection and refund conditions.

Ask for a copy of the agreement.

Before paying

  1. Ask Royal Gas for the exact amount.

  2. Confirm the approved payment channel.

  3. Check the beneficiary details.

  4. Pay only the confirmed amount.

  5. Keep the receipt.

  6. Send proof if requested.

  7. Ask Royal Gas to confirm that the payment has been allocated to your application.

Royal Gas’s FAQ lists card, online, bank transfer and collector options for bills, but ask which method is accepted for your new connection payment. Royal Gas

Confirm That the Application Is Complete

Before booking the technician, ask Royal Gas:

  • Have you received all my documents?

  • Has my agreement been accepted?

  • Has my payment been received and allocated?

  • Is my application approved for scheduling?

  • What is my application or account reference?

  • Is there anything still needed from the landlord or building management?

If a previous tenant occupied the unit, ask how the account transfer or closure will be handled and when your billing responsibility begins.

Do not assume the previous occupant’s account or deposit automatically transfers to you.

Book the Technician Appointment

Once Royal Gas confirms the application is ready:

  1. Call 800 7427 or follow the booking instructions provided.

  2. Give your building, unit and application reference.

  3. Request the next available appointment.

  4. Confirm the date and time window.

  5. Ask whether you or an authorised representative must be present.

  6. Confirm whether building security needs advance notice.

  7. Ask whether the cooker must already be installed.

  8. Ask whether electricity must be active.

  9. Confirm whether cooker connection is included.

  10. Ask whether there is a charge if the appointment must be rescheduled.

Royal Gas’s published terms state that connection, disconnection and maintenance are to be carried out by Royal Gas technicians. Royal Gas

Prepare the Cooker and Apartment

Before the appointment, ask Royal Gas:

  • Is the cooker compatible with the gas supplied to the building?

  • Is any conversion required?

  • Who is authorised to perform the conversion?

  • Is the cooker already safely installed?

  • Are a hose or other parts needed?

  • Are those parts included in the quoted fee?

  • What happens if the appliance fails inspection?

Prepare the property

  • Ensure the technician can enter the apartment.

  • Inform security if required.

  • Make the cooker and meter accessible.

  • Keep your identification, application reference and payment receipt available.

  • Have the landlord or property manager’s contact details ready in case an appliance issue needs approval.

Do not connect, disconnect or alter the gas line yourself.

What Happens on Activation Day?

Before the technician arrives

  1. Confirm the appointment time.

  2. Ensure you or the approved representative can provide access.

  3. Show the technician the cooker and meter location if required.

  4. Confirm any outstanding charges before authorising additional work.

During the visit

Ask the technician to confirm:

  • The correct apartment and gas meter.

  • Whether the appliance is compatible with the supplied gas.

  • Whether the connection can be completed.

  • Whether any defects or additional work are identified.

  • Whether the required safety checks have been completed.

  • Whether the gas service is active.

Before the technician leaves

Ask:

“Is the connection complete, and is the cooker safe and ready to use?”

Also ask:

  • Where is the gas shut-off control?

  • How do I report a fault?

  • What is my gas account number?

  • When will billing begin?

  • Will I receive a connection confirmation?

Only use the gas appliance after the technician confirms that it is ready and safe.

What If Activation Cannot Be Completed?

Ask Royal Gas for the specific reason and next step.

Possible issueWhat to do
Documents are incompleteAsk exactly which document is missing and where to send it.
Payment has not been allocatedProvide the receipt and ask the accounts team to trace it.
Cooker is unavailableArrange delivery and ask Royal Gas to reschedule.
Cooker is incompatible or faultyAsk what authorised repair or conversion is needed and who is responsible for the cost.
Apartment or meter is inaccessibleCoordinate with building management and book another visit.
Building gas system is not readyAsk building management and Royal Gas who must complete the outstanding work or approvals.
Previous account issueAsk for a written explanation and how the accounts will be separated.

Before booking another visit, ask whether a revisit fee applies.

Registration and Activation Timeline

Suggested planning schedule

WhenWhat to do
5–7 business days before move-inConfirm the supplier, documents, fees and cooker requirements.
As soon as documents are readySubmit the application and request the agreement and payment instructions.
After submittingConfirm receipt, sign the agreement and pay the confirmed charges.
Before move-inBook the technician and arrange building access.
Activation dayComplete the connection and safety checks.

This is a planning schedule, not a Royal Gas guarantee. Ask the company for the next available appointment once your application is complete.

A delay may occur if documents are missing, the cooker needs work, payment is not allocated, building access is unavailable or the property’s gas system is not ready.

After Activation: Set Up Your Online Account

Once Royal Gas gives you your account details, you can register for online services.

Royal Gas’s FAQ says a new online user may need:

  • Account number.

  • Building code.

  • Flat number. Royal Gas

Steps

  1. Open the Royal Connect Customer Portal.

  2. Select Create account or Register your account.

  3. Follow the instructions shown.

  4. Provide the account and property details requested.

  5. Set up your login.

  6. Check that the correct unit and contact details appear.

The portal advertises access to billing, meter readings, service updates and account activity. crm.royalgas.com

If you do not know the building code, ask Royal Gas or building management.

Your Gas Bills and Meter Reading

Royal Gas’s FAQ says customers receive a gas consumption invoice every month, by email, with an SMS notification when the invoice is generated. Royal Gas

Check your first bill

Review:

  • Name and apartment number.

  • Gas account number.

  • Billing period.

  • Opening and closing meter readings, if shown.

  • Gas consumption.

  • Service or maintenance charges.

  • VAT.

  • Payment due date.

Royal Gas says a meter correction factor may be applied when calculating the bill. Ask the billing team to explain it if it appears on your invoice.

If the bill does not match the meter

Royal Gas says you can send a photo of the gas meter by email or use the self-meter reading option so its billing team can review the invoice. Royal Gas

Paying Future Bills

Royal Gas lists:

  • Online account payment.

  • Quick payment.

  • Bank transfer.

  • A collector visit.

  • Credit or debit card payment.

If paying by bank transfer, ask Royal Gas for the current beneficiary details and send the payment slip to the Dubai support address it confirms.

Royal Gas’s published terms list a AED 30 doorstep collection fee. Confirm whether that fee remains current before requesting a collector. Royal Gas

Moving Out and Deposit Refund

Before leaving, call 800 7427 to request gas disconnection and book a technician.

Royal Gas’s FAQ says:

  • A technician appointment is booked to disconnect the gas.

  • The final invoice generally takes 2–4 working days after disconnection.

  • The security deposit is adjusted against the final invoice.

  • Customers should provide bank details for the remaining refund. Royal Gas

Steps

  1. Contact Royal Gas before your move-out date.

  2. Provide your account number and requested disconnection date.

  3. Book the technician appointment.

  4. Provide access to the apartment.

  5. Keep the disconnection confirmation.

  6. Wait for the final bill.

  7. Settle any amount due or confirm the deposit adjustment.

  8. Submit the requested bank details.

  9. Request the clearance letter.

Royal Gas’s terms say the adjusted deposit is payable within a period of 90 days from disconnection, subject to the stated conditions and production of the original receipt. Ask the company to confirm the current refund process and timeline for your account. Royal Gas

Keep your original deposit receipt.

If You Smell Gas

  1. Leave the affected area and move to a safe location.

  2. Do not turn electrical switches or appliances on or off.

  3. Do not use a phone, matches, cigarettes or another ignition source in the affected area.

  4. From a safe location, call Royal Gas Dubai: 800 7427.

  5. If there is fire or immediate danger, call Dubai Civil Defence: 997.

  6. Follow the instructions of emergency responders and building management.

Royal Gas lists 800 7427 for Dubai gas leaks, including outside office hours. Royal Gas

Ready-to-Send Enquiry

To: support@royalgas.com
Subject: New gas connection – [Building name], [Apartment number]

Hello Royal Gas Team,

I am a new tenant at [building name, community and apartment number], and my intended move-in date is [date].

Please confirm whether Royal Gas supplies this unit. I would also appreciate confirmation of:

  1. The documents required for my application.

  2. The security deposit, connection fee, registration fee and any other applicable charges.

  3. Whether the quoted amounts include VAT.

  4. The gas service agreement and approved payment methods.

  5. The earliest available technician appointment.

  6. Whether cooker connection is included or charged separately.

  7. Whether the cooker needs any approved conversion.

  8. Whether electricity must be active before the visit.

  9. Whether I or an authorised representative must be present.

  10. How and when I will receive my gas account number.

My contact number is [number], and my email address is [email].

Thank you.

Step by step

  1. 1. Prepare the documents

    Prepare clear copies of:

    1. Emirates ID.

    2. Passport.

    3. Visa copy.

    4. Signed tenancy contract.

    Use clear file names, for example:

    • Emirates_ID.pdf

    • Passport.pdf

    • Visa.pdf

    • Tenancy_Contract.pdf

    These filenames are only a practical suggestion; Royal Gas has not published a filename rule.

  2. 2. Write the email

    Send your request to:

    support@royalgas.com

    Suggested subject

    New gas connection – [Building name] – [Apartment number]

    Suggested email

    Hello Royal Gas Team,

    I am a new tenant at [building name, community and apartment number] and would like to apply for a new gas connection.

    My tenancy starts on [date], and my intended move-in date is [date].

    I have attached my Emirates ID, passport, visa copy and tenancy contract.

    Please confirm:

    1. Whether Royal Gas supplies this unit.

    2. Whether any additional documents are required.

    3. The security deposit, connection fee and any other charges.

    4. How I should sign the gas service agreement.

    5. How I should make payment.

    6. The earliest available technician appointment.

    My mobile number is [number].

    Thank you.

  3. 3. Send and retain the email

    Before sending:

    1. Confirm the apartment number and building name.

    2. Check that each attachment opens and is readable.

    3. Confirm your mobile number and email address.

    4. Send the email.

    5. Keep the sent email and attachments for reference.

  4. 4. Request acknowledgement

    Ask Royal Gas to confirm:

    • It received the email.

    • The attachments are complete.

    • The application can proceed.

    • Whether a reference number has been created.

    • The amount due and payment method.

    If there is no response and your move-in is approaching, call 800 7427 with the date you sent the email.

  5. 5. Respond to any follow-up

    Royal Gas may ask you for a form, agreement, unit details or additional information.If a document is rejected, ask exactly what needs to be corrected and where to resend it.

    Method 2: Register Through the Website

    Royal Gas’s online services page has a New Gas Connection option linked to its customer system. Royal Gas

  6. 6. Open the online services page

  7. 7. Select “New Gas Connection”

    Choose:

    New Gas Connection

    The link leads to:

    Royal Gas Connection Application

  8. 8. Follow the application instructions

    It would be misleading to list exact screens or buttons beyond the published entry point.

    When you open it:

    1. Follow the instructions displayed.

    2. Select the correct region if requested.

    3. Enter the requested tenant and property details.

    4. Upload the documents requested.

    5. Review the agreement and charges.

    6. Submit the request.

    7. Save the application confirmation or reference, if one is provided.

    Information to have ready

    Even if the screen labels differ, keep the following nearby:

    • Full name.

    • Mobile number and email.

    • Building and unit number.

    • Emirates ID.

    • Passport and visa copy.

    • Tenancy contract.

    • Intended move-in date.

  9. 9. If the website asks for an existing account number

    Do not enter the previous tenant’s account number as your own unless Royal Gas specifically instructs you to.

    Contact Royal Gas and ask:

    “I am a new tenant and do not have a Royal Gas account number yet. How do I complete the new connection application?”

    You can also use the published email route.

  10. 10. If you cannot submit

    Call 800 7427 and explain:

    • Which page you reached.

    • Whether an error message appeared.

    • Whether documents uploaded successfully.

    • Whether a payment was taken.

    Do not submit and pay again until Royal Gas confirms whether the first attempt went through.

Common questions

Can I register without a tenancy contract?

Royal Gas’s FAQ says its listed documents are required for connection approval. Ask whether it can begin reviewing the request while you obtain the signed contract.

Can I register without an Emirates ID?

Emirates ID is on Royal Gas’s published checklist. If it is pending, call and ask whether an alternative can be accepted temporarily.

Can I apply before I move in?

You can contact Royal Gas and begin preparing the application before move-in. Ask when the agreement, payment and technician appointment can be completed.

Does DEWA need to be active?

Ask the team whether electricity is needed for your specific cooker, detector or technician checks before the appointment.

Can someone else attend the technician visit?

Ask Royal Gas whether it accepts an authorised representative and whether an authorisation letter or identification is needed.

Is the deposit refundable?

Royal Gas’s terms say the deposit is refundable after adjustment of the final payable bill, subject to its conditions. Keep the original receipt.

How long does activation take?

Royal Gas does not publish a standard timeframe. Ask for the next available appointment once your documents, agreement and payment are accepted.

Can I use the previous tenant’s account?

Ask Royal Gas to close or separate the previous account and confirm how yours will be opened. Do not assume the previous deposit or account transfers automatically.

Sources

More Gas guides

Related guides

Next step

Home internet in Dubai: getting connected in your new home