GUIDE
How to register with South Energy for gas
For a residential customer, South Energy currently publishes a refundable AED 750 deposit and a AED 350 “new connection & disconnection fee,” excluding taxes. The wording does not clearly explain whether AED 350 is one combined fee or how it is collected, so confirm the total and payment schedule before paying. South Energy
The basic process is
Confirm South Energy serves your unit → create a portal account → request Gas Service → upload documents → review and sign the agreement → pay the confirmed charges → arrange physical activation → complete the safety check.
South Energy Contact Details and Useful Links
| What you need | Contact or link |
|---|---|
| Customer service and general enquiries | 04 814 1349 |
| General email | info@southenergy.ae |
| Billing enquiries | billing@southenergy.ae |
| WhatsApp listed by South Energy | +971 54 792 9871 |
| Gas leak or gas supply issue | 600 565657 |
| Website | southenergy.ae |
| Customer portal | South Energy Customer Portal |
| Application instructions | South Energy Application Procedure |
| Gas charges | South Energy Gas Services Pricing |
| Office | Dubai South Headquarters, Dubai |
| Office hours | Monday–Friday, 8:00 a.m.–4:00 p.m. |
South Energy lists 600 565657 for a gas leak or interrupted gas supply. Its general customer service number and office hours are separate. South Energy
Before visiting: Call South Energy to confirm whether the office can process a new gas application in person and whether an appointment is needed.
Confirm South Energy Is the Supplier for Your Unit
South Energy says it manages the central gas farm and network in Dubai South’s Residential District. That does not mean every property in Dubai South necessarily uses the same gas arrangement. Confirm your specific building and unit. South Energy
Ask your landlord, property agent or building management:
“Is South Energy the gas supplier for this apartment or villa, and do I need to register a tenant account?”
Ask building management
-
Is there a central piped gas supply in the unit?
-
Is South Energy the appointed supplier?
-
Is the tenant responsible for the gas account?
-
Is gas included in the rent or billed separately?
-
Is the gas cooker or hob included with the property?
-
Where is the gas meter?
-
Is the unit already connected to the building’s gas system?
-
Does the building require a move-in permit before the gas technician can attend?
-
Who can provide access to the gas meter or service area?
-
Has the previous occupant’s gas account been closed?
If the property has an electric or induction hob
An electric or induction cooker does not use a gas connection. Check whether the property has any other gas-powered appliances before applying.
If the cooker is included
Ask whether it is installed, working and suitable for the property’s gas supply. Also agree with the landlord who pays if it needs repair or conversion.
Contact South Energy Before Applying
Call 04 814 1349 or email info@southenergy.ae.
Give the team:
-
Your full name.
-
Community and building name.
-
Apartment or villa number.
-
Tenancy start date.
-
Intended move-in date.
-
Mobile number and email.
-
Whether the cooker is already installed.
Ask these questions
-
Does South Energy supply gas to my unit?
-
Do I need to register separately for gas?
-
Which documents do I need?
-
Is my Ejari sufficient, or is the tenancy contract also required?
-
What is the exact deposit and connection amount for my unit?
-
Is the AED 350 charge one combined connection and disconnection fee?
-
What tax applies to each charge?
-
When do I sign the gas agreement?
-
Does a technician need to visit?
-
Is cooker connection included in the fee?
-
Does electricity need to be active?
-
Must I be present during the appointment?
-
What is the next available activation date?
Ask for an itemised quotation or agreement for your unit.
Documents to Prepare
South Energy’s English application procedure lists the following for individual customers:
-
Passport copy or Emirates ID.
-
Ejari copy for a tenant. South Energy
Its Arabic application page provides a more detailed tenant list, including passport and residence visa, Emirates ID, Ejari and power of attorney where required. Because the two versions differ, ask South Energy which documents it currently requires for your application. South Energy
Individual tenant checklist
Prepare clear copies of:
| Document | Published or practical requirement |
|---|---|
| Ejari certificate | Listed for tenants in South Energy’s English procedure. |
| Emirates ID | Listed as an alternative to passport in the English procedure; the Arabic page asks for both sides. |
| Passport copy | Have it ready, especially if requested under the more detailed checklist. |
| Residence visa details | The Arabic procedure mentions a residence visa copy. |
| Signed tenancy contract | Useful to have ready; ask whether it must be uploaded in addition to Ejari. |
| Mobile number and email | Needed for the account and application updates. |
| Building and unit details | Needed to identify the property. |
| Power of attorney or authorisation | Ask if another person is applying or signing on your behalf. |
If the tenant is a company
South Energy’s English procedure lists:
-
Valid trade licence.
-
Tax registration certificate.
-
Emirates ID of the authorised signatory or power of attorney.
-
Ejari copy for a tenant.
Confirm whether it also needs the tenancy contract and an authorisation letter. South Energy
If you do not have Ejari yet
South Energy’s English tenant checklist says Ejari copy. Ask whether it will accept a signed tenancy contract temporarily or whether the request must wait until Ejari is issued.
If your Emirates ID is pending
The English procedure says passport copy or Emirates ID, but the Arabic checklist is more detailed. Ask South Energy which identification it will accept for your application before relying on an alternative.
South Energy Gas Costs
Published residential prices
South Energy’s gas pricing page lists the following residential charges. The page says prices are subject to change and the agreed charges will appear in the contract. South Energy
| Charge | Published amount | Notes |
|---|---|---|
| Security deposit | AED 750 | Described as refundable. |
| New connection & disconnection fee | AED 350 | Listed as payable by the end user/tenant. |
| Gas consumption base rate | AED 20 per m³ | English page specifies 37 mbar. |
| Monthly fixed service charge | AED 20 | Listed as a monthly charge. |
| Design and construction NOC | AED 2,000 | South Energy identifies this as payable by the building owner during design and construction. |
The pricing page states that these amounts are exclusive of taxes.
What should the tenant budget before activation?
The published figures are:
-
AED 750 refundable deposit.
-
AED 350 new connection & disconnection fee.
That is AED 1,100 before any applicable tax, if South Energy confirms that the AED 350 is a single combined fee payable at registration.
However, the wording “new connection & disconnection fee” does not clearly say whether AED 350 is one combined charge or how it is collected. Ask South Energy to confirm:
-
Is AED 350 one combined fee or does it apply separately to each event?
-
What is payable before activation?
-
What tax applies to each item?
-
Is any cooker connection or fitting charge additional?
Do not treat the AED 2,000 design and construction NOC as a normal tenant move-in charge; South Energy identifies it as a building-owner charge during design and construction.
Gas pressure: confirm the rate for your unit
The English pricing page lists the consumption base price as AED 20/m³ at 37 mbar, while the Arabic page lists 27 mbar. Because the pages conflict on pressure, ask South Energy which tariff and pressure apply to your unit. South Energy
Example of recurring charges
If South Energy confirms the published AED 20 fixed monthly service charge, it may apply separately from consumption. The first bill could also include a partial billing period or other agreed charges. Confirm the actual tariff in your agreement.
Method 1: Register Through the Customer Portal
South Energy’s English application procedure provides the following sequence:
-
Open the Customer Portal.
-
Log in or sign up.
-
Select New Service.
-
Choose Gas Service.
-
Provide the documents and follow the remaining steps. South Energy
Method 2: Apply or Get Help by Email
South Energy’s Arabic application page says customers may use the portal or send completed forms to info@southenergy.ae. Its English page emphasises the portal. Because the two versions provide different levels of detail, ask South Energy to confirm whether email applications are currently accepted for your unit. South Energy
Email steps
-
Email info@southenergy.ae.
-
Request the current gas registration form and document list.
-
Complete and sign the form if provided.
-
Attach the documents South Energy requests.
-
Include the building, unit and intended move-in date.
-
Ask for the agreement, charges and payment instructions.
-
Request a written acknowledgement and reference number.
Suggested subject
New tenant gas registration – [Building name] – [Unit number]
Method 3: In-Person Assistance
South Energy lists its head office at Dubai South Headquarters and office hours of Monday to Friday, 8:00 a.m.–4:00 p.m. South Energy
Before visiting, call 04 814 1349 and ask:
-
Can I submit a new gas registration at the office?
-
Do I need an appointment?
-
Which originals and copies should I bring?
-
Can I sign the agreement there?
-
Can I pay the deposit and connection fee there?
-
Will the technician appointment be arranged at the visit?
Take your Ejari, identification, tenancy contract, property details and payment receipt if you have already paid.
Mobile Application
South Energy directs customers to its Customer Portal, which you may be able to open in a mobile browser. Ask South Energy whether an official app is currently available and whether it supports gas registration.
Confirm Registration Is Complete
Before arranging the technician, ask South Energy to confirm:
-
Your gas account or request number.
-
Correct building and unit.
-
Agreement signed and accepted.
-
Security deposit received.
-
Connection charge paid or scheduled.
-
Billing start date.
-
Whether a technician visit is required.
-
The contact responsible for the physical activation.
Ask for the opening meter reading
Request:
-
Meter number.
-
Opening reading.
-
Date of the reading.
-
Date your account becomes billable.
If you can safely access the meter and building management permits it, take a dated photo around handover.
Arrange the Gas Activation Appointment
South Energy’s public application page confirms the registration route but does not give a detailed residential technician-booking procedure. Once your account is approved, ask customer service:
-
Is a physical technician visit required for my unit?
-
Who schedules it?
-
What is the earliest appointment?
-
Must the tenant or account holder attend?
-
Can an authorised representative provide access?
-
Is the cooker connection included in the published fee?
-
Does electricity need to be active?
-
Is building security approval required?
-
Who should I contact if the appointment is missed or delayed?
Request the appointment date and time window in writing or through the portal if possible.
Prepare the Cooker Before Activation Day
Ask South Energy or its authorised technician:
-
Is the cooker compatible with the LPG supplied to the building?
-
Is it already safely installed?
-
Is conversion required?
-
Are a hose or other fittings needed?
-
Are parts and cooker connection included?
-
Who is authorised to carry out the work?
-
Who pays if the landlord’s cooker needs repair?
South Energy identifies its Dubai South Residential District supply as LPG, but the technician should confirm compatibility for your specific unit and appliance. South Energy
Do not connect, disconnect or alter the gas line or cooker yourself.
Activation Day: Step by Step
Before the technician arrives
-
Confirm the date and time.
-
Ensure the apartment is accessible.
-
Inform building security if required.
-
Make the cooker and meter accessible.
-
Keep your account number and payment receipt ready.
-
Have the landlord or property manager’s contact number available.
During the visit
Ask the technician to confirm:
-
The correct unit and meter.
-
Whether the cooker is compatible.
-
Whether any additional work or fittings are required.
-
The cost of additional work before it is carried out.
-
Whether the connection and required safety checks are complete.
-
Whether the supply is active.
Before the technician leaves
Ask:
“Is the gas connection complete, and is the cooker safe and ready for me to use?”
Also ask:
-
Where is the gas shut-off control?
-
What should I do if the gas detector alarms?
-
What number should I call for a leak?
-
Will I receive an activation confirmation?
-
When will billing start?
Only use the cooker after the authorised technician confirms it is ready and safe.
What If Activation Cannot Be Completed?
| Possible issue | What to do |
|---|---|
| Application or documents incomplete | Ask South Energy exactly what is missing and where to submit it. |
| Payment not allocated | Provide the receipt and ask the billing team to trace it. |
| Cooker unavailable | Arrange delivery and ask about rescheduling. |
| Cooker incompatible or faulty | Request an authorised assessment and quotation for any repair or conversion. |
| Meter or apartment inaccessible | Coordinate with building management and schedule another visit. |
| Building gas system not ready | Ask South Energy and building management what work or approval is pending. |
| Electricity needed but inactive | Activate electricity if the technician confirms it is required, then reschedule. |
Ask whether a revisit fee applies before booking another appointment.
How Long Does Activation Take?
Suggested planning timeline
| When | Action |
|---|---|
| 5–7 business days before move-in | Confirm South Energy is the supplier, obtain Ejari and identification, and ask for charges. |
| As soon as documents are ready | Create or access the portal account and submit New Service → Gas Service. |
| After registration | Review and sign the agreement and pay the confirmed charges. |
| Before move-in | Confirm account approval and schedule any required technician visit. |
| Activation day | Provide access and complete the safety checks. |
This is a planning schedule, not a South Energy guarantee. Ask the team for the actual appointment date once your application is complete.
Your First Gas Bill
South Energy’s published residential pricing includes:
-
A monthly fixed service charge.
-
A gas consumption base rate.
The published figures are subject to change, and the English and Arabic pages differ on the pressure associated with the consumption rate. Check the rate in your signed agreement and ask South Energy to explain the first bill. South Energy
Check the first invoice for:
-
Your name and unit number.
-
Gas account number.
-
Billing period.
-
Opening and closing meter readings, if shown.
-
Gas consumption.
-
Monthly fixed charge.
-
Connection or other one-time charges.
-
Tax.
-
Payment due date.
For billing questions, contact 04 814 1349 or billing@southenergy.ae. South Energy
Moving Out and Deposit Refund
South Energy says customers can request cancellation and refund through the portal.
Steps
-
Open the Customer Portal.
-
Log in.
-
Select Cancel Service, as described in South Energy’s procedure.
-
Choose Gas Service.
-
Provide the requested information and documents.
-
Confirm whether a technician must visit.
-
Obtain the final bill and settle any balance.
-
Submit the cancellation and refund request.
-
Provide the requested bank details.
-
Keep the clearance and refund confirmation.
South Energy’s FAQ says the refund may take 14 business days to process from the date the cancellation and refund form is submitted. Ask the team when your form is considered complete and whether any additional steps affect the timeline. South Energy
Gas Emergency
If you smell gas or suspect a leak:
-
Leave the affected area and move to a safe location.
-
Do not turn electrical switches or appliances on or off.
-
Do not use matches, a lighter, cigarettes or another ignition source.
-
From a safe location, call 600 565657 and report the issue.
-
If there is a fire or immediate danger, call Dubai Civil Defence on 997.
-
Follow the instructions of emergency responders and building management.
South Energy specifically says to call 600 565657 for a gas leak and 997 for a fire. South Energy
Ready-to-Send Enquiry
To: info@southenergy.ae
Subject: New tenant gas registration – [Building name], [Unit number]Hello South Energy Team,
I am a new tenant at [building name, community and unit number], and my intended move-in date is [date].
Please confirm whether South Energy supplies gas to this unit and advise:
-
The documents required for my registration.
-
Whether I should apply through the Customer Portal or can submit the application by email.
-
The security deposit and all charges payable before activation.
-
Whether the published AED 350 connection and disconnection fee is one combined fee.
-
The applicable VAT and payment methods.
-
The gas service agreement and current consumption and fixed-charge rates.
-
Whether a technician appointment is required and the earliest available date.
-
Whether cooker connection or any fittings are included.
-
Whether electricity must be active before the visit.
-
Whether I or an authorised representative must be present.
My mobile number is [number], and my email address is [email].
Thank you.
Step by step
1. Open the official portal
Go to:
You can also:
-
Open southenergy.ae.
-
Select Customer Portal.
-
Wait for the Dubai South-hosted portal to open.
South Energy’s own website links to this portal. South Energy
If the portal does not load
-
Try opening it again from South Energy’s own website.
-
Contact 04 814 1349 or info@southenergy.ae.
-
Ask whether the portal is operational and whether an email application is available.
-
2. Sign in or create a portal account
South Energy says:
-
Existing users should log in.
-
Customers without an account should sign up. South Energy
If you already have an account
-
Enter your existing credentials.
-
Use the password reset option if needed.
-
Confirm your contact details are current.
-
Proceed to the service request.
If you are a new user
-
Select the available Sign Up or registration option.
-
Enter the information requested on the portal.
-
Complete any email or mobile verification shown.
-
Set your login credentials.
-
Sign in.
Important
The public registration screens we could find did not establish every field or the exact verification sequence for the South Energy portal. Follow the page displayed and contact South Energy if you need assistance.
-
3. Open “New Service”
After logging in:
-
Locate the service-management section.
-
Select New Service.
-
Choose Gas Service.
South Energy publishes these service labels in its application procedure. South Energy
Be careful to choose Gas Service. The same portal also handles district cooling, but gas and cooling are separate services with different charges.
-
4. Enter your customer details
The exact fields after login could not be verified. If the portal requests them, enter:
-
Full name as shown on your ID.
-
Mobile number.
-
Email address.
-
Customer type: individual or company, as applicable.
-
Emirates ID or passport information, if requested.
Check before continuing
-
Does the name match your tenancy and identification?
-
Is your email correct?
-
Can South Energy reach you on the mobile number?
-
Are you applying as the tenant or an authorised representative?
If a field is unclear, ask South Energy before entering an incorrect value.
-
5. Enter the property details
If requested, provide:
-
Community or district.
-
Building or tower name.
-
Apartment or villa number.
-
Property type.
-
Tenancy start date.
-
Intended move-in date.
-
Meter or property reference, if known.
Where to find the details
-
Tenancy contract and Ejari.
-
Building management.
-
Landlord or property agent.
-
Existing handover documents.
If the portal asks for a meter or property reference that you do not have, contact building management or South Energy. Do not guess.
-
6. Upload the documents
For an individual tenant, South Energy’s English checklist says:
-
Passport copy or Emirates ID.
-
Ejari copy.
Upload the documents requested by the portal. If South Energy asks for additional identification, tenancy or authorisation documents, provide those as instructed.
Before uploading
-
Make sure the document is clear and complete.
-
Check the tenant name and unit number.
-
Follow any file format or size limit displayed by the portal.
-
Keep a copy of each document submitted.
-
7. Review the service request
Before submitting, check:
-
Gas Service is selected.
-
The correct building and unit appear.
-
Your contact details are correct.
-
The tenancy information is accurate.
-
The required documents are attached.
-
Any preferred activation or move-in date is correct, if the portal requests one.
Then submit the request using the portal’s instructions.
-
8. Save the request confirmation
After submission:
-
Save the confirmation screen or email.
-
Record the request or case number if one is provided.
-
Check your email and phone for updates.
-
Ask South Energy whether the documents are complete.
The public instructions do not show what confirmation screen appears after a real submission, so the exact reference format could not be verified.
Agreement, Deposit and Payment
South Energy’s Arabic application procedure says that after registration, its team prepares the cooling or gas service agreement, and the customer signs it and pays the deposit before requesting activation and receiving supply. The English page summarises the process more briefly. Confirm the exact order for your application. South Energy
-
9. Receive and review the agreement
Ask South Energy for the gas service agreement and check:
-
Your name and unit.
-
Security deposit.
-
Connection and disconnection charges.
-
Monthly fixed charge.
-
Consumption rate.
-
Applicable taxes.
-
Billing start date.
-
Payment due dates.
-
Deposit refund and disconnection terms.
-
10. Confirm the amount payable now
Ask:
“How much must I pay before the gas can be activated, and which part is the refundable deposit?”
Request an itemised breakdown, especially because the published AED 350 fee wording is ambiguous.
11. Pay through the approved channel
South Energy’s FAQ lists monthly bill payment through:
-
The customer portal.
-
Online bank transfer.
-
Direct deposit at a Dubai Islamic Bank ATM.
-
Its Dubai South office.
For bank transfer or deposit, the FAQ says to share proof with billing@southenergy.ae. Ask South Energy which methods are accepted for your initial deposit and connection payment, as the FAQ wording is specifically about monthly bills. South Energy
-
12. Keep and submit proof
-
Save the payment receipt.
-
Include your name, unit number and request reference if sending proof.
-
Ask South Energy to confirm payment has been received and allocated.
-
Keep the deposit receipt for move-out.
-
Common questions
Does every property in Dubai South use South Energy for gas?
Do not assume so. South Energy says it manages the gas farm and network in Dubai South’s Residential District, but confirm the supplier for the exact building and unit.
Can I register through the website?
Yes. South Energy’s published process is to use the Customer Portal, sign in or sign up, then select New Service → Gas Service.
Is there a mobile app?
Ask South Energy or use the customer portal in a mobile browser.
Can I apply by email?
South Energy’s Arabic procedure mentions sending completed forms to info@southenergy.ae, while its English procedure emphasises the portal. Confirm whether email registration is currently accepted.
Do I need Ejari?
South Energy’s English procedure lists an Ejari copy for tenants. If your Ejari is pending, ask whether another document is accepted temporarily.
Can I apply without an Emirates ID?
The English procedure says passport copy or Emirates ID, while the Arabic version gives a more detailed list. Confirm what South Energy accepts for your application.
How much is the deposit?
South Energy’s published residential gas pricing lists AED 750, described as refundable. Confirm the current amount for your unit.
How much is the connection fee?
The pricing page lists AED 350 for “new connection & disconnection fee,” excluding taxes. Ask whether that is one combined fee and how it is collected.
Does electricity need to be active?
South Energy’s published registration instructions did not confirm a universal electricity requirement. Ask whether it is needed for your unit’s cooker, detector or safety checks.
How long does activation take?
A standard South Energy activation timeframe was not publicly verified. Ask for a confirmed appointment after your application, agreement and payment are complete.
Sources
More Gas guides
Related guides
Next step
Home internet in Dubai: getting connected in your new home