GUIDE
How to set up Al-Futtaim cooling in Dubai Festival City
The starting point for a Dubai Festival City tenant is to contact the residential team on 800 332 and ask for the cooling account process for the specific apartment. Dubai Festival City’s contact page lists this number and residential contact details. Dubai Festival City
I also could not confirm a standard deposit, activation fee or activation timeline. I’ve marked those items clearly below so that the guide remains accurate.
Al-Futtaim cooling at a glance
| Item | What we can confirm |
|---|---|
| Relevant company | Dubai Festival City Cooling Co. LLC holds a Dubai district cooling permit |
| Relevant area | Dubai Festival City, subject to the permitted buildings and your unit’s arrangements |
| First contact for residents | Dubai Festival City / Al-Futtaim residential team |
| Phone | 800 332 |
| Residential email | Residential@alfuttaim.ae |
| District cooling enquiry email | customerrelations.DFC@alfuttaim.com is listed on an older Dubai Festival City information page; confirm it is still the correct address |
| Documents | Ask for the current checklist for your unit |
| Deposit and fees | Ask for an itemised quotation |
| Activation timeline | Not publicly verified; confirm with the responsible team |
| Online application | A specific public new-tenant cooling registration portal could not be verified |
The current Dubai Festival City contact page lists 800 332 and Residential@alfuttaim.ae. An older Dubai Festival City page specifically directs district cooling enquiries to customerrelations.DFC@alfuttaim.com. Dubai Festival City
Account activation and physical cooling activation
These may be separate:
-
Account activation: Your customer and billing account has been created.
-
Physical cooling activation: Chilled water is available to the apartment’s AC system.
Ask the billing team and building management to confirm both.
In some properties, the AC may already work while the account is still being transferred or registered.
What to do on activation day
Confirm the account status
Ask the billing team:
“Is my cooling account active, and what is my account number and billing start date?”
If the account is in the landlord’s name, ask the landlord to confirm that it is active.
Confirm whether access is required
Ask building management whether a technician needs access to:
-
Your apartment;
-
The cooling meter; or
-
A building service room.
If access is needed, coordinate with security or reception.
Make sure electricity is available
Your thermostat and internal AC equipment may need electricity.
Check that DEWA electricity is active and that the AC controls turn on.
Test the AC
-
Switch on the AC.
-
Select cooling mode.
-
Set the temperature below the current room temperature.
-
Allow time for the system to respond.
-
Check that air is coming from the vents.
-
Check whether the room begins to cool.
-
Test each room or zone if there are separate controls.
If the AC is not cooling
Contact building facilities management or your landlord’s maintenance team to check the apartment’s AC equipment.
Also ask the cooling or billing team:
-
Is my account active?
-
Is the cooling supply available to the unit?
-
Is there a building-wide issue?
-
Is a technician visit needed?
-
Which team is responsible for the fault?
Keep a record of when you reported the issue.
Record the meter reading
If the cooling meter is accessible, take a dated photo of the opening reading.
If it is in a restricted area, ask building management or the billing provider whether it can provide the reading.
After activation: understand the cooling bill
The exact charges depend on the unit and agreement. Ask the billing provider to explain your tariff.
Your bill may include:
| Charge | What it generally means |
|---|---|
| Consumption charge | Cooling energy recorded by the unit’s meter |
| Fixed or capacity charge | A charge for cooling availability or capacity, where applicable |
| Metering or billing charge | A charge for meter reading or billing services, where applicable |
| VAT and other charges | Amounts shown in the applicable agreement or invoice |
Check your first bill
Review:
-
Account holder’s name;
-
Building and unit number;
-
Billing period;
-
Billing start date;
-
Meter reading or consumption;
-
Fixed and variable charges;
-
VAT; and
-
Payment due date.
If a charge appears wrong, contact the billing team and provide the invoice and any opening meter reading.
Suggested timeline
| When | What to do |
|---|---|
| After signing the tenancy | Confirm the cooling supplier, billing company and who pays |
| Before applying | Check the previous account and request the current registration instructions |
| Several working days before moving | Submit the form and requested documents |
| During processing | Review the agreement and pay confirmed charges |
| Before move-in | Confirm the account status, billing start date and physical cooling status |
| On activation day | Test the AC and report any issue |
| After moving in | Check your first bill and save the agreement and receipts |
Contact details
Dubai Festival City / Al-Futtaim Residential
-
Phone: 800 332
-
Residential email: Residential@alfuttaim.ae
-
Listed residential hours: Monday to Friday, 8:30 am–5:30 pm
-
Contact page: Dubai Festival City Contact Us Dubai Festival City
District cooling enquiry
- An older official Dubai Festival City page lists customerrelations.DFC@alfuttaim.com. Confirm through 800 332 whether it is still the correct cooling contact. Dubai Festival City
Step by step
1. Confirm whether your property uses Dubai Festival City Cooling
Before applying, ask your landlord, broker or building management:
-
Is my building supplied by Dubai Festival City Cooling?
-
Who handles the billing for my apartment?
-
Is the account held by the tenant, the landlord or the property management company?
-
Do I need to open a separate cooling account?
-
Is cooling included in my rent?
-
Has the previous occupant’s account been closed?
-
Is the cooling supply currently active?
Why is this important?
The cooling supplier and the company that sends the bill are not always the same.
Your building may have separate parties responsible for:
-
Producing and supplying chilled water;
-
Reading meters and issuing bills;
-
Managing the property; and
-
Maintaining the AC equipment inside your apartment.
Ask for the exact company name and contact details for your unit, rather than relying only on the name “Al-Futtaim Cooling.”
Example question to building management
“I am moving into [building name], unit [number]. Could you please confirm the district cooling provider, who handles the cooling bill and whether I need to register an account in my name?”
-
2. Check who pays the cooling charges
Read your tenancy contract and addendum. Look for wording such as:
-
District cooling;
-
Chiller charges;
-
Chiller-free;
-
Cooling consumption;
-
Utilities included; or
-
Tenant’s utility responsibilities.
Then confirm with your landlord:
-
Who pays the cooling bill?
-
Does the tenant pay the full bill or only the consumption?
-
Are any fixed charges included in the rent?
-
Who pays the deposit?
-
Who pays any registration or activation fee?
-
When does billing responsibility begin?
What if the apartment is chiller-free?
Ask exactly what is covered.
For example:
-
Is the entire cooling bill included?
-
Is only the fixed charge included?
-
Does the tenant pay the consumption?
-
Does the account stay in the landlord’s name?
-
Will the tenant receive a separate invoice?
Get the arrangement in writing where possible.
-
3. Check the previous cooling account
Ask the landlord or property manager:
“Has the previous cooling account been closed, and is there anything outstanding that could delay my registration?”
If the residential team or billing provider says there is an outstanding balance, ask:
-
Whose account is the balance on?
-
What dates does it cover?
-
Who is responsible for settling it?
-
Does it prevent a new account from being opened?
-
What needs to happen before my move-in?
Do not assume that you need to pay a previous tenant’s or landlord’s balance.
Example message to your landlord
Hi [Name], I am arranging the cooling for the apartment. Could you please confirm who handles the cooling account, whether it should be registered in my name and whether the previous account has been closed? Thank you.
When should I start?
Start as soon as:
-
Your tenancy contract is signed;
-
You know your building and unit number;
-
You have a planned move-in date; and
-
The landlord or building management can confirm the account arrangement.
A practical recommendation is to begin at least five working days before moving in. This is a planning recommendation, not a confirmed Al-Futtaim service timeline.
Ask the responsible team how long registration and activation take for your unit.
-
4. Prepare your information and documents
Ask the residential or billing team for the exact requirements. In the meantime, keep these documents ready:
-
Signed tenancy contract;
-
Ejari certificate;
-
Emirates ID copy, front and back;
-
Passport copy;
-
Landlord’s details; and
-
Any NOC or previous-account confirmation if requested.
These are useful documents to prepare, but they should not all be described as mandatory until the responsible team confirms them.
Information to have ready
-
Full name;
-
Mobile number;
-
Email address;
-
Building name;
-
Apartment or villa number;
-
Tenancy start date;
-
Planned move-in date; and
-
Any unit or account reference provided by the landlord or building management.
If the tenancy is under a company name
Ask whether the following are required:
-
Company trade licence;
-
Tenancy contract and Ejari;
-
Passport and Emirates ID of the authorised signatory;
-
Proof of signing authority; and
-
Company VAT details, if applicable.
Option 1: Start by phone
Phone step 1: Call the residential team
Call:
800 332
Dubai Festival City lists the residential contact hours as:
- Monday to Friday: 8:30 am–5:30 pm
Confirm current hours around public holidays. Dubai Festival City
Phone step 2: Give your property details
Tell the representative:
“I am a new tenant moving into Dubai Festival City. I would like to arrange the district cooling account for my unit.”
Provide:
-
Building name;
-
Unit number;
-
Tenancy start date; and
-
Planned move-in date.
Phone step 3: Ask them to confirm the correct team
Ask:
-
Is Dubai Festival City Cooling the supplier for my unit?
-
Who handles the customer account and billing?
-
Do I need to register as a tenant?
-
Can the account remain in the landlord’s name?
-
Is there a separate billing company I need to contact?
Phone step 4: Request the application process
Ask the team to send you:
-
The current registration link or form;
-
The document checklist;
-
The agreement or terms;
-
The deposit and fee breakdown;
-
Payment instructions; and
-
The expected registration and activation timeline.
Phone step 5: Save the details
Write down:
-
The representative’s name;
-
Date and time of the call;
-
The team or company you were referred to;
-
Any reference number; and
-
The email address or portal link they provide.
Option 2: Request the process by email
The current residential contact page lists:
Residential@alfuttaim.ae
A Dubai Festival City information page also lists customerrelations.DFC@alfuttaim.com for district cooling enquiries. Because that page was created for an older COVID-era update, confirm that the address is still used for cooling registrations. Dubai Festival City
Email step 1: Send your enquiry
To: Residential@alfuttaim.ae
Subject: New tenant district cooling registration – [Building and unit number]Dear Dubai Festival City Residential Team,
I am moving into a property in Dubai Festival City and would like to arrange the district cooling account for my unit.
My details are:
-
Building name: [Building]
-
Unit number: [Unit number]
-
Tenancy start date: [Date]
-
Planned move-in date: [Date]
-
Mobile number: [Number]
Could you please confirm:
-
Who supplies and bills the district cooling for my unit;
-
Whether the account should be registered in my name or the landlord’s name;
-
The registration link or form;
-
The required documents;
-
The security deposit and applicable fees;
-
The payment process; and
-
The expected registration and activation timeline?
Thank you.
Email step 2: Review the reply
When the team replies, check:
-
Is this the correct department for your unit?
-
Is the form for a new tenant?
-
Which documents are mandatory?
-
Does the landlord need to sign or provide an NOC?
-
Is there a previous account issue?
-
What is the total amount payable?
-
How will you know when the account is active?
Email step 3: Submit the requested information
Follow the instructions provided by the responsible team.
Before sending documents, check that:
-
The recipient is the address confirmed by the residential team;
-
Your building and unit number are correct;
-
Your documents are readable; and
-
You have completed any required signatures.
Email step 4: Ask for a reference
If no reference is provided, ask:
“Could you please confirm receipt of my application and provide a reference number for follow-up?”
Option 3: Apply online or through an app
When you call or email, ask:
-
Is there an online portal for new tenant registration?
-
Is the portal used for opening a cooling account or only for paying existing bills?
-
Do I need to create a login before applying?
-
Can I upload documents online?
-
Can I pay the deposit and fees through the portal?
-
Will I receive an application reference?
-
Is there a mobile app for my building?
If the team provides a link, confirm that it is the correct official route for your unit before entering your details.
Option 4: Ask about in-person registration
The older Dubai Festival City information page says district cooling payments could be made by credit card at building receptions or by bank transfer. Because that information may have changed, ask the residential team whether reception currently handles:
-
New account registration;
-
Document submission;
-
Cooling payments;
-
Account enquiries; or
-
Activation requests. Dubai Festival City
Before visiting, ask:
-
Which reception or office should I go to?
-
What are the opening hours?
-
Do I need an appointment?
-
Which documents should I bring?
-
Can I pay and receive a receipt there?
-
Will my landlord need to attend or sign?
-
5. Complete the registration form
If the responsible team provides a form, complete it using the information on your tenancy documents.
The exact form fields could not be verified, but it may ask for details such as:
-
Your full name;
-
Contact information;
-
Building and unit number;
-
Tenancy start date;
-
Landlord’s details; and
-
Account or billing information.
Before submitting
Check that:
-
Your name matches your identification.
-
The building and unit number are correct.
-
Your tenancy dates match the contract.
-
Your mobile number and email address are correct.
-
All requested documents are attached.
-
You have signed where required.
-
You understand who will be the account holder.
If a field is unclear, ask the team before completing it.
-
6. Ask the team to check the previous account
After receiving your application, the billing team may need to check the existing account for the unit.
Ask:
-
Is the previous account closed?
-
Does the landlord need to provide an NOC?
-
Is there an outstanding balance?
-
Can my application proceed?
-
What is the expected account start date?
If there is a problem, ask the team to explain what is required and who needs to act.
-
7. Review the deposit and fees
Before paying, request an itemised quotation for your building and unit.
Ask for a breakdown of:
Item What to confirm Security deposit Amount, whether refundable and who pays it Registration fee Whether it applies and the amount Activation or connection fee Whether it applies to a new tenant Meter or administration fee Whether there are any additional charges VAT Whether the amounts include VAT Total The amount required before registration or activation How much is the deposit?
Ask:
“Please confirm the current cooling security deposit and total registration charges for [building and unit number].”
Do not assume the amount is the same as Empower, Emicool or another provider.
Is the deposit refundable?
Ask the billing team to confirm:
-
Whether the deposit is refundable;
-
Whether the final bill is deducted from it;
-
How to request the refund;
-
What documents and bank details are needed; and
-
The expected refund timeline.
-
8. Make payment
Once the team confirms the charges:
-
Check the payment method.
-
Confirm the beneficiary and account reference.
-
Pay through the channel confirmed for your unit.
-
Keep the receipt and payment reference.
-
Send proof of payment if requested.
-
Ask the team to confirm that the payment has been allocated to your application.
The older Dubai Festival City page mentions credit card payments at building receptions and bank transfer for cooling, but these methods should be confirmed before use. Dubai Festival City
-
9. Review and sign the cooling agreement
If you receive a cooling or billing agreement, read it before signing.
Check:
-
Your name;
-
Building and unit number;
-
Whether you are named as tenant;
-
Billing start date;
-
Deposit and registration fees;
-
Fixed and consumption charges;
-
Payment due dates;
-
Responsibilities of the tenant and landlord; and
-
Move-out, final bill and refund terms.
Ask whether your landlord must also sign. This requirement could not be verified for every Dubai Festival City unit.
Save a copy of the completed agreement.
-
10. Confirm the account and activation date
Once the application has been processed, ask for confirmation of:
-
Your cooling account number;
-
The account holder’s name;
-
Building and unit number;
-
Deposit and payment received;
-
Billing start date;
-
Whether cooling is already active;
-
Whether a technician needs to visit;
-
Whether access to your apartment is required; and
-
How you will receive and pay future bills.
How long does activation take?
A current, building-specific activation timeline could not be verified.
Ask the team:
“How many working days will it take to complete my registration, and when will the cooling be available in the apartment?”
Also ask when the timeline begins:
-
After the form is submitted;
-
After documents are approved;
-
After payment is received; or
-
After the agreement is signed.
-
Common questions
Does every Al-Futtaim property use Dubai Festival City Cooling?
Do not assume so. The verified permit is for Dubai Festival City Cooling Co. LLC, and the applicable systems and buildings are identified in the permit schedules. Confirm the provider for the specific property. rsbdubai.gov.ae
Do I always need a separate cooling account?
Not necessarily. Ask the residential team whether the account should be in your name, the landlord’s name or handled through another arrangement.
Can I register before my tenancy starts?
Ask the team whether it can process the application in advance. Confirm the service and billing start dates before signing or paying.
Do I need Ejari?
The current checklist could not be verified. Keep your Ejari ready and ask the team whether it is required for your unit.
Can I register without an Emirates ID?
Ask whether a passport or other document can be accepted while your Emirates ID is being processed.
Can my broker or landlord register for me?
Ask the billing team whether it accepts an application from an authorised representative and what authorisation is needed.
You should still review the agreement and charges yourself.
What if the AC is already working?
Still confirm who holds the cooling account and when billing starts. Working AC does not necessarily mean your account has been opened.
What if my move-in date changes?
Contact the responsible team as soon as possible and ask whether the account start date, billing date or technician appointment can be changed.
Will I get my deposit back when I move out?
If a refundable deposit applies, ask the billing team for the final bill and refund process. Keep your receipt and completed agreement.