Build my checklist
← Back to the Area move-in guides guide

GUIDE

Moving into Business Bay: cooling, gas, internet and permits

By JJay Ellis ·Checked against official sources· Updated November 2026Follow @getsetl.ae

Who provides cooling in Business Bay?

Empower operates the Business Bay district cooling network, one of Dubai’s major cooling projects. However, you should still confirm who bills your apartment and whether you need an individual cooling account. dewa.gov.ae

Ask building management for the official registration instructions, deposit, activation charges and recurring fees. Check whether your bill includes fixed capacity charges as well as consumption. If the property is advertised as “chiller-free,” get written confirmation of which charges the landlord covers.

If management confirms that you should register directly with Empower, use the official Empower portal.

Contact setl.ae if you are unsure how to organise your cooling connection. We can help you understand the next steps alongside your Ejari and other move-in arrangements.

How do I arrange gas?

Ask management whether your apartment uses central gas or electric cooking. Do not assume one gas supplier serves every Business Bay tower. Obtain the approved supplier’s name and official application instructions for your building.

Before arranging activation, confirm the deposit, connection charges, inspection requirements and whether you must be present. Check your cooker’s compatibility, and use the supplier or an authorised technician for gas connections.

If the apartment has an electric hob, check the available electrical connection and appliance specifications before buying a replacement.

Which internet provider can I use?

Check availability for your exact building and apartment with du or e&. Confirm the connection type, package availability and installation appointment before committing.

If you already have home internet, request a relocation assessment before cancelling. Both providers offer home-moving services; ask about relocation charges, equipment and any changes to your contract commitment. www.du.ae

setl.ae can help you arrange your internet and organise installation around your handover date.

Do I need a move-in permit?

Confirm the procedure directly with your tower’s building management. There is no single move-in application that you should assume applies to every Business Bay building.

Request the document checklist, application deadline, approved moving hours and any deposit requirements. Have your signed tenancy contract, Ejari, identification and mover details available, then follow the building’s specific instructions.

Check whether permit approval includes a service-lift reservation. Ask separately about furniture deliveries, cleaners, appliance installers and contractors, as these may require different approvals.

How do I arrange Ejari and DEWA?

Once your tenancy contract is signed, contact setl.ae for Ejari registration. The team will explain the required documents and help you complete this step before the applications that depend on it.

Arrange DEWA activation or, if you are moving from another Dubai property, check the DEWA Move-To service. It coordinates your new connection and old disconnection using your new Ejari and premises details. Keep the old property connected for any cleaning and inspection that require electricity and water. dewa.gov.ae

What practical checks matter in Business Bay?

Confirm the loading entrance and truck route with security. Give movers the correct tower entrance, vehicle-height restrictions and service-lift booking details. For mixed-use buildings, check that they use the residential loading and access arrangements.

Verify your parking bay, remote and access cards before moving day. Ask about visitor parking and delivery procedures rather than assuming nearby commercial parking is available to residents.

Test your commute from the actual building entrance and car park at your usual travel time. Check the walking route to public transport and everyday shops, including crossings and building access.

Before unpacking, test cooling, water pressure, hot water, drainage and supplied appliances. Photograph existing defects and report them in writing. Confirm the maintenance contact, resident app, facilities access and building rules.

Moving to Business Bay and unsure where to start? Contact setl.ae. We provide Ejari registration services and help you organise utilities, internet and building requirements around your moving date, giving you a clear plan for your particular tower.

Sources

More Area move-in guides guides

Related guides

Setl is Dubai's free move-in assistant: one checklist for Ejari, DEWA, AC, gas, internet and permits, in the right order for your building.